Obligatory digger shot. We ALL love an excavator, don't we? 

It's much less muddy on site now, since a road base has been installed from the site front entrance to plots 3 and 4, enabling  better movement for the team & vehicles.

Water and Gas have been connected to our Davison Close site. Plot 1 footing concrete has been installed.

At plot 2, all footing, block & beam have been installed, piles exposed and waste & water service run ready for connection. Lots of progress since our last visit!

At plots 3 & 4, the rear garden planters have been installed, with brickwork to height and filled with topsoil. We can't wait to see these planted up.

At plots 3 & 4, block & beam have been installed, steel posts installed to foundations, plus all waste & water services run, elevation brick & block-work done.

These walls will form the new homes of plots 3 & 4 of Davison Close.

With thanks to... Sam Nicholson from Endeavour Construction Joe Errington & Tom Malins from Liberty QS Stefanos Cholevas from Naismiths Nicola Spreadbury from  Synsera Homes