Davison Close

GREENWICH

TAKE A VIRTUAL TOUR OF OUR DAVISON CLOSE SITE IN GREENWICH

Most of the windows are now installed in plots 3 and 4.

WINDOWS

WORK IN

PROGRESS

A COSY CONSTRUCTION SITE

There's still a lot of equipment and building materials on site.  It can therefore be quite a challenge to move around.

BLOCK, BEAM & BRICK

Plot 1 block & beam and steel bases have been installed. Plot 2 steels and brickwork are now complete. Plots 3 & 4 brickwork and roof are both complete.

PLOTS 3&4

First fix plumbing and electrical have been completed and plasterboard is almost complete.   The scaffolding has been removed and lower level roofs have been completed.   Lower floor walls have been mist coated and kitchen fitting has started.